To the Miyawaka-shi synthesis top

Announcement of the result of bid, contract for November, 2018

The last update date:

We publish content as a result of bid, contract based on regulations of "law about promotion of adequacy of bid of public construction and contract" (2000 law No. 127) Article 8.

For November, 2018

[for November 1, 2018 open bill]PDF Auction result (H30.11.1) We open with the other window(PDF: 44 kilobytes)

(1)Miyata shopping center dismantling construction enforcement design business consignment

 

[for November 2, 2018 open bill]PDF Auction result (H30.11.2) We open with the other window(PDF: 65.6 kilobytes)

(1)Kanemaru (the west no ura 2 mechanic ward) jinaigaiosuikankyo*zokoji

(2)Yoshikawa Bridge bridge removal construction

(3)Imahashi, bishosendoroaratameryokoji

(4)Kanemaru (kanommen 1 mechanic ward) jinaigaiosuikankyo*zokoji

 

[for November 7, 2018 open bill]PDF Auction result (H30.11.7) We open with the other window(PDF: 40.7 kilobytes)

(1)Health center palette air conditioner update construction

 

[for November 12, 2018 open bill]PDF Auction result (H30.11.12) We open with the other window(PDF: 66.6 kilobytes)

(1)Nagaizuru, Mukoda line road improved construction

(2)Isomitsu (Maemura 1 mechanic ward) jinaigaiosuikankyo*zokoji

(3)New Kasamatsu housing complex Building No. 113 dismantling construction

 

[for November 14, 2018 open bill]PDF Auction result (H30.11.14) We open with the other window(PDF: 50.9 kilobytes)

(1)Pump repair work for the Shinkansen shortage of water facilities agriculture

 

[for November 19, 2018 open bill]PDF Auction result (H30.11.19) We open with the other window(PDF: 63.7 kilobytes)

(1)Shrine Hita district steep slope collapse measures construction

(2)Eastern General Sports Park adjustment reservoir maintenance construction

(3)Wakita district steep slope collapse measures construction

(4)Takehara ancient tomb parking lot maintenance construction

 

[for November 20, 2018 open bill]PDF Auction result (H30.11.20) We open with the other window(PDF: 38.5 kilobytes)

(1)Water pipe repair work for Rikimaru

 

[for November 21, 2018 open bill]PDF Auction result (H30.11.21) We open with the other window(PDF: 76.1 kilobytes)

(1)The Kasamatsu training center roof waterproofing repair work

(2)Isomitsu district drainage pump facilities maintenance construction

(3)Historic spot Takehara ancient tomb preservation maintenance construction

(4)It is ward (3) osuikankyojitsuhodokoshi*keigyomuikotozuke for Fukumaru second processing

 

[for November 27, 2018 open bill]PDF Auction result (H30.11.27) We open with the other window(PDF: 48.1 kilobytes)

(1)Harada, Numaguchi line (the second mechanic ward) road improved construction

(2)Kamiokuma, Nishikawa line road improved construction

We relate to this page
Inquiry
(ID: 447089)
Miyawaka-shi government office 〒 823-0011  29-1, Miyata, Miyawaka-shi, Fukuoka   Tel: 0949-32-0510 (main) Fax: 0949-32-9430  

[open agency time] Until from 8:30 a.m. to 5:15 p.m. of from Monday to Friday (except Saturdays, Sundays, and holidays, New Year holidays)

※Only citizen's section window (various certificate issuance) extends every Thursday at time until 7:15 p.m.

Copyright (C) 2016 MIYAWAKA CITY ALL Right Reserved.

Miyawaka-shi government office

〒823-0011 29-1, Miyata, Miyawaka-shi, Fukuoka
Tel: 0949-32-0510 (main)

[open agency time] Until from 8:30 a.m. to 5:15 p.m. of from Monday to Friday (except Saturdays, Sundays, and holidays, New Year holidays)
※Only Civic Life Division window (various certificate issuance) extends every Thursday at time until 7:15 p.m.
Copyright (C) 2016 MIYAWAKA CITY ALL Right Reserved.