To the Miyawaka-shi synthesis top

Announcement of the result of bid, contract for November, 2018

The last update date:

We publish content as a result of bid, contract based on rule of "law about promotion of adequacy of bid of public construction and contract" (2000 law 127th) Article 8.

For November, 2018

[for November 1, 2018 open bill]PDF Auction result (H30.11.1) We open with the other window(PDF: 44 kilobytes)

(1)Miyata shopping center dismantling construction enforcement design business consignment

 

[for November 2, 2018 open bill]PDF Auction result (H30.11.2) We open with the other window(PDF: 65.6 kilobytes)

(1)Kanemaru (west no ura 2 mechanic ward) jinaigaiosuikankyo*zokoji

(2)Kikkawa Bridge bridge removal construction

(3)Imahashi, bishosendoroaratameryokoji

(4)Kanemaru (kanommen 1 mechanic ward) jinaigaiosuikankyo*zokoji

 

[for November 7, 2018 open bill]PDF Auction result (H30.11.7) We open with the other window(PDF: 40.7 kilobytes)

(1)Health center palette air conditioner update construction

 

[for November 12, 2018 open bill]PDF Auction result (H30.11.12) We open with the other window(PDF: 66.6 kilobytes)

(1)Nagaizuru, Mukoda line road improved construction

(2)Isomitsu (Maemura 1 mechanic ward) jinaigaiosuikankyo*zokoji

(3)New Kasamatsu housing complex Building No. 113 dismantling construction

 

[for November 14, 2018 open bill]PDF Auction result (H30.11.14) We open with the other window(PDF: 50.9 kilobytes)

(1)Pump repair work for Shinkansen shortage of water facilities agriculture

 

[for November 19, 2018 open bill]PDF Auction result (H30.11.19) We open with the other window(PDF: 63.7 kilobytes)

(1)Shrine Hita district steep slope collapse measures construction

(2)Eastern general exercise Park adjustment reservoir maintenance construction

(3)Wakita district steep slope collapse measures construction

(4)Takehara old burial mound parking lot maintenance construction

 

[for November 20, 2018 open bill]PDF Auction result (H30.11.20) We open with the other window(PDF: 38.5 kilobytes)

(1)Water pipe repair work for Rikimaru

 

[for November 21, 2018 open bill]PDF Auction result (H30.11.21) We open with the other window(PDF: 76.1 kilobytes)

(1)Kasamatsu training center roof waterproofing repair work

(2)Isomitsu district drainage pump facilities maintenance construction

(3)Historic spot Takehara old burial mound preservation maintenance construction

(4)It is ward (3) osuikankyojitsuhodokoshi*keigyomuikotozuke for Fukumaru second processing

 

[for November 27, 2018 open bill]PDF Auction result (H30.11.27) We open with the other window(PDF: 48.1 kilobytes)

(1)Harada, Numaguchi line (second mechanic ward) road improved construction

(2)Kamiokuma, Nishikawa line road improved construction

We relate to this page
Inquiry
(ID: 447089)
Miyawaka-shi government office 〒 823-0011  29-1, Miyata, Miyawaka-shi, Fukuoka   Tel: 0949-32-0510 (main) Fax: 0949-32-9430  

[open agency time] Until from 8:30 a.m. to 5:15 p.m. of from Monday to Friday (except Saturdays, Sundays, and holidays, the year-end and New Year holidays)

※Only Civic Life Division window (various certificate issuance) extends every Thursday at time until 7:15 p.m.

Copyright (C) 2016 MIYAWAKA CITY ALL Right Reserved.

Miyawaka-shi government office

〒823-0011 29-1, Miyata, Miyawaka-shi, Fukuoka
Tel: 0949-32-0510 (main)

[open agency time] Until from 8:30 a.m. to 5:15 p.m. of from Monday to Friday (except Saturdays, Sundays, and holidays, the year-end and New Year holidays)
※Only Civic Life Division window (various certificate issuance) extends every Thursday at time until 7:15 p.m.
Copyright (C) 2016 MIYAWAKA CITY ALL Right Reserved.